  • Production Performance of Oil & Natural Gas Sector for the month of January, 2012
  • I. A. CRUDE OIL PRODUCTION – PERFORMANCE

Month / Period

Planned Target (MMT)

Actual Production (MMT)

%age achievement

Surplus(+) Shortfall(-) Vis-à-vis target (%age)

Surplus(+) Shortfall(-) over last year (%age)

January, 2012*

3.255

3.173

97.5

-2.5

-1.9

April-January, 2012*

31.903

31.872

99.9

-0.1

1.5

April-January, 2011

 

31.411

 

 

 

MMT: Million Metric Tonnes.

*: Provisional.

  • B. COMPANY-WISE ACHIEVEMENT

Company / State

Planned Target (MMT)

Actual Production (MMT)

%age achievement

Surplus(+) Shortfall(-) (%age)

ONGC

2.0290

1.9860

97.9

-2.1

 Gujarat

0.4660

0.4630

99.4

 

 Andhra Pradesh

0.0190

0.0250

131.6

 

 Tamil Nadu

0.0150

0.0210

140.0

 

 Assam

0.1010

0.1040

103.0

 

 Mumbai Region (incl Mumbai High)

1.4270

1.3730

96.2

 

OIL

0.3193

0.3205

100.4

0.4

 Assam

0.3176

0.3188

100.4

 

 Arunachal Pradesh

0.0017

0.0017

97.7

 

PRIVATE/JVC

0.9069

0.8660

95.5

-4.5

TOTAL

3.2553

3.1725

97.5

-2.5

  • C. REASONS FOR SHORTFALL

Company / State

Reasons for shortfall

ONGC (Mumbai High Offshore)

Less than anticipated oil gain from development wells. Production effected due to high GOR/high water cut and less than anticipated oil gain from Vasai East. Less line condensate receipt from Off-shore.

ONGC (Gujarat)

Poor influx and increasing water cut trend.

  • A statement showing Crude Oil Production during January, 2012 and cumulatively for the period April- January, 2012 vis-à-vis 2010-11 planned production is at Annexure-I.
  • II. A. REFINERY PRODUCTION   (IN TERMS OF CRUDE THROUGHPUT)

Month / Period

Planned Target (MMT)

Actual Production (MMT)

%age achievement

Surplus(+) Shortfall(-) Vis-à-vis target (in %age)

Surplus(+) Shortfall(-) over last year (in %age)

January, 2012*

14.25

14.53

102.0

2.0

-4.6

April-January, 2012*

135.21

140.73

104.1

4.1

3.1

April- January, 2011

 

136.49

 

 

 

 *: Provisional.

  • The crude throughput in IOC (Guwahati, Haldia & Panipat), BPCL (Mumbai & Kochi), HPCL (Mumbai), MRPL (Mangalore), ONGC Tatipaka and RIL Jamnagar refineries have exceeded their planned target.
  • The crude throughput in IOC (Barauni, Koyali, Mathura, Bongaigaon & Digboi), HPCL (Visakh), CPCL (Manali & Narimanam (CBR), NRL (Numaligarh), & EOL (Vadinar) refineries was less than their planned target.
  • B. REASONS FOR SHORTFALL :

Company / State

Reasons for shortfall

IOCL,Bongaigaon

● T'put restricted due to low crude availability.

IOCL,Barauni

● T'put restricted as per the Corporate economics.

HPCL, Visakh

● T'put during Jan'12 was lower than the MOU Excellent Target due to feed regulation of CDUs because of DHDS limitations.

  • A statement showing refinery-wise production during the month of January, 2012 and cumulatively for the period April- January, 2012 vis-à-vis 2010-11 planned target is at Annexure-II.
  • III. REFINERY CAPACITY UTILISATION [excluding RPL(SEZ)]

Month

Utilisation (%)

Period

Utilisation (%)

 January, 2012*

106.7

April- January, 2012

104.9

 January, 2011

115.4

April- January, 2011

104.8

  • The refinery-wise details of the capacity utilisation during January, 2012 and cumulatively for the period April- January, 2012 vis-a-vis 2010-11 are given in Annexure-III.
  • IV. A. NATURAL GAS PRODUCTION

Month / Period

Planned Target (MCM)

Actual Production (MCM)

%age achievement

Surplus(+) Shortfall(-) Vis-à-vis target (%age)

Surplus(+) Shortfall(-) over last year (%age)

January, 2011*

4476.7

3962.5

88.5

-11.5

-8.9

April-January, 2011*

43051.7

40156.7

93.3

-6.7

-8.8

April-January, 2010

 

44033.0

 

 

 

MCM: Million Cubic Metres.

*: Provisional.

  • B. COMPANY-WISE ACHIEVEMENT

Company / State

Planned Target (MCM)

Actual Production (MCM)

%age achievement

Surplus(+) Shortfall(-) (%age)

ONGC

2071.6

2045.6

98.7

-1.3

 Gujarat

152.4

163.6

107.3

 

 Rajasthan

1.3

1.1

86.7

 

 Andhra Pradesh

108.2

120.8

111.6

 

 Tamil Nadu

101.8

113.0

111.1

 

 Assam

41.3

43.7

105.9

 

 Tripura

48.8

56.1

114.9

 

 Mumbai High Offshore

1617.8

1547.2

95.6

 

OIL

211.6

214.2

101.3

1.3

 Assam

190.1

195.7

102.9

 

 Arunachal Pradesh

1.6

1.6

100.0

 

 Rajasthan

19.9

17.0

85.2

 

PRIVATE/JVC

2193.5

1702.8

77.6

-22.4

 Onshore $

72.3

56.2

77.7

 

 Offshore

2121.2

1646.5

77.6

 

TOTAL

4476.7

3962.5

88.5

-11.5

  • $: Including Coal Bed Methane production.
  • C. REASONS FOR SHORTFALL

Company / State

Reasons for shortfall

ONGC (Mumbai High Off-shore)

Less than anticipated production from C- Series and B-22 field. Delayed development of rig in North Tapti. Control of Oil production due to high GOR for better reservoir management.

PRIVATE/JVC (Mumbai High Off-shore)

Oil/Gas production is less in D1, D3 & MA fields. Total 5 to 6 wells in D1,D3 and 1 well in MA have ceased to flow due to water/sand ingress.

PRIVATE/JVC (Assam)

Wells are being optimised to increase oil production and water ingress issues in wellbores. No gas producion from Bheema field due to water loading in well. Natural decline of NSA field.

PRIVATE/JVC (West Bengal)

Prologed dewatering in new wells resulted in less gas producion.

PRIVATE/JVC (Rajasthan)

Gas production is less due to decline in NANG production from RDG field.

  •  A statement showing natural gas production during January, 2012 and cumulatively for the period April- January, 2012 vis-à-vis 2010-11 is at Annexure-IV.