Ministry of Petroleum & Natural Gas21-March, 2012 15:31 IST

  • Production Performance of Oil& Natural Gas Sector for the Month of February,2012

  • I.  A. CRUDE OIL PRODUCTION – PERFORMANCE

    Month / Period

    Planned Target (MMT)

    Actual Production (MMT)

    %age achievement

    Surplus(+) Shortfall(-) Vis-à-vis target (%age)

    Surplus(+) Shortfall(-) over last year (%age)

     

     

     

    February, 2012*

    3.016

    2.997

    99.4

    -0.6

    0.4

     

    April-February, 2012*

    34.919

    34.869

    99.9

    -0.1

    1.4

     

    April-February, 2011

     

    34.397

     

     

     

     

MMT: Million Metric Tonnes.

*: Provisional.

  • B. COMPANY-WISE ACHIEVEMENT

  • Company / State

    Planned Target (MMT)

    Actual Production (MMT)

    %age achievement

    Surplus(+) Shortfall(-) (%age)

     

     

    ONGC

    1.8790

    1.8380

    97.8

    -2.2

     

     

     Gujarat

    0.4230

    0.4290

    101.4

     

     

     

     Andhra Pradesh

    0.0170

    0.0240

    141.2

     

     

     

     Tamil Nadu

    0.0150

    0.0190

    126.7

     

     

     

     Assam

    0.0930

    0.0960

    103.2

     

     

     

     Mumbai Region (incl Mumbai High)

    1.3310

    1.2700

    95.4

     

     

     

    OIL

    0.3001

    0.3057

    101.9

    1.9

     

     

     Assam

    0.2985

    0.3040

    101.8

     

     

     

     Arunachal Pradesh

    0.0016

    0.0017

    106.3

     

     

     

    PRIVATE/JVC

    0.8369

    0.8532

    101.9

    1.9

     

     

    TOTAL

    3.0160

    2.9969

    99.4

    -0.6

     

     

  •  C. REASONS FOR SHORTFALL

  • Company / State

    Reasons for shortfall

    ONGC (Mumbai High Offshore)

    Less than anticipated oil gain from development wells. Production effected due to high water cut, less than anticipated oil gain from Vasai East. Control of Oil production due to high GOR for better reservoir management.

    PRIVATE/JVC (Offshore)

    Oil and gas production is less due to delay in well interventions & intermittent flow from gas wells PG # 1 & # 10.

  • A statement showing Crude Oil Production during February, 2012 and cumulatively for the period April- February, 2012 vis-à-vis 2010-11 planned production is at Annexure-I.

  • II. A. REFINERY PRODUCTION

  •  (IN TERMS OF CRUDE THROUGHPUT)

    Month / Period

    Planned Target (MMT)

    Actual Production (MMT)

    %age achievement

    Surplus(+) Shortfall(-) Vis-à-vis target (in %age)

    Surplus(+) Shortfall(-) over last year (in %age)

    February, 2012*

    13.68

    14.18

    103.7

    3.7

    6.2

    April-February, 2012*

    148.89

    154.91

    104.0

    4.0

    3.4

    April- February, 2011

     

    149.85

     

     

     

  •  *: Provisional.

  • The crude throughput in IOC (Guwahati, Koyali, Haldia Mathura & Digboi), BPCL (Mumbai & Kochi), HPCL (Mumbai), MRPL (Mangalore), ONGC Tatipaka and RIL Jamnagar refineries have exceeded their planned target.

  • The crude throughput in IOC (Barauni, Bongaigaon & Panipat), HPCL (Visakh), CPCL (Manali & Narimanam (CBR)), NRL (Numaligarh), & EOL (Vadinar) refineries was less than their planned target.

  • B. REASONS FOR SHORTFALL :        

Company / State   

 Reasons for shortfall

IOCL,Bongaigaon

 T'put restricted due to low crude availability.

IOCL,Barauni

 T'put restricted as per the Corporate economics.

HPCL, Visakh

 T'put during Jan'12 was lower than the MOU Excellent Target due to feed regulation of CDUs imposed by APPCB.

  • A statement showing refinery-wise production during the month of February, 2012 and cumulatively for the period April- February, 2012 vis-à-vis 2010-11 planned target is at Annexure-II.

  •  III. REFINERY CAPACITY UTILISATION [excluding RPL (SEZ)]

Month

Utilisation (%)

Period

Utilisation(%)

 February, 2012*

111.3

April- February, 2012

105.5

 February, 2011

112.0

April- February, 2011

105.1

  •  The refinery-wise details of the capacity utilisation during February, 2012 and cumulatively for the period April- February, 2012 vis-a-vis 2010-11 are given in Annexure-III.

  • IV. A. NATURAL GAS PRODUCTION

    Month / Period

    Planned Target (MCM)

    Actual Production (MCM)

    %age achieve-ment

    Surplus(+) Shortfall(-) Vis-à-vis target (%age)

    Surplus(+) Shortfall(-) over last year (%age)

     

    February, 2011*

    4150.4

    3609.1

    87.0

    -13.0

    -7.7

     

    April-February, 2011*

    47202.2

    43700.0

    92.6

    -7.4

    -8.8

     

    April-February, 2010

     

    47940.5

     

     

     

     

MCM: Million Cubic Metres.

*: Provisional.

  • B. COMPANY-WISE ACHIEVEMENT

    Company / State

    Planned Target (MCM)

    Actual Production (MCM)

    %age achievement

    Surplus(+) Shortfall(-) (%age)

    ONGC

    1959.4

    1917.0

    97.8

    -2.2

     Gujarat

    141.5

    160.2

    113.2

     

     Rajasthan

    1.2

    0.8

    68.8

     

     Andhra Pradesh

    100.3

    109.8

    109.5

     

     Tamil Nadu

    94.0

    104.6

    111.3

     

     Assam

    38.3

    40.7

    106.2

     

     Tripura

    45.5

    52.6

    115.4

     

     Mumbai High Offshore

    1538.6

    1448.2

    94.1

     

    OIL

    198.2

    199.9

    100.8

    0.8

     Assam

    177.8

    186.2

    104.7

     

     Arunachal Pradesh

    1.6

    1.1

    67.8

     

     Rajasthan

    18.9

    12.6

    66.8

     

    PRIVATE/JVC

    1992.8

    1492.2

    74.9

    -25.1

     Onshore $

    70.4

    53.2

    75.6

     

     Offshore

    1922.4

    1439.0

    74.9

     

    TOTAL

    4150.4

    3609.1

    87.0

    -13.0

$: Including Coal Bed Methane production.

  • C. REASONS FOR SHORTFALL

Company / State

Reasons for shortfall

ONGC (Mumbai High Off-shore)

Less than anticipated production from C- Series and B-22 field. Delayed development of rig in North Tapti. 

ONGC (Rajasthan)

Less offtake by M/s. RRVUNL

PRIVATE/JVC (KG-DWN-98/3 Off-shore)

Oil/Gas production is less in D1, D3 & MA fields. Total 6 wells in D1,D3 and 1 well in MA have ceased to flow due to water/sand ingress.

PRIVATE/JVC (Assam)

Intermittent flow from wells K # 2,3 & 7 and water ingress issues in wellbores. No gasproducion from Bheema field due to water loading in well. Natural decline of NSA field.

PRIVATE/JVC (West Bengal)

CBM produced in smalll quantities are being internally used and flared as no market in near vicinity.

PRIVATE/JVC (Arunachal Pradesh)

Only producing well Amguri # 4 ceased to flow since Oct., 2011 due to sand ingress in wellbore.

PRIVATE/JVC (Rajasthan)

Gas production is less due to decline in NANG production from RDG field.