Standard Post with Image

Green Power Corridor: A Step Closer towards 172 GW of Renewable Capacity Addition by 2022

News

Faced with an ambitious green energy target of 175,000 megawatts (MW) by 2022, India has started work to set up transmission corridors to supply green power across the national grid

Source: live mint

SNP Insight

Technological innovations along with system strenghtening is required in order to evacuate renewable power in the coming years. Since, generation from renewable sources are susceptible to continuous ups and downs therefore strict scheduling guidelines should be framed in order to avoid grid collaspe. For now this can be seen as a stepping stone towards greener India.

Source: SNP Infra