Connect Socially

Details

Database of 35,000+ Upcoming and Operational Infrastructure Projects in India - An Analysis
report-image
INR : ₹ 75000 | USD : $1950
INR : ₹ 85000 | USD : $2175
INR : ₹ 85000 | USD : $2175

Realizing the need of infrastructure development to foster rapid economic growth, the government of India has been making efforts to augment the infrastructure development across all spheres in the country. Investment outlay on infrastructure development has been more than doubled from US$ 218 billion in the X Plan to US$ 515 billion in the XI Plan. As a result of this increased investment allocations to infrastructure sector especially to private sector, infrastructure sector as a whole has received project approvals worth Rs 4,58,209 crore in the last five years (2007-11). Annual infrastructure project approvals in the country increased from Rs 55,424 crore in 2007 to Rs 1,36,327 crore by 2010. However, 2011 witnessed a decline in the infrastructure project approvals to Rs 93,025 crore mainly because of the general economic slowdown. Infrastructure sector is expected to offer immense opportunities in the near future as well, with US$ 1 Trillion investment being envisaged for the Infrastructure development in the proposed 12th Plan (2012-17).

Report Classification: Research Report Tags: Upcoming Infrastructure Projects in India- An Analysis Investment Outlays, Private Sector Investment, Sector wise Share, State-wise Share, Investment Type Share, Stages of Development Share , Owner wise share, Detailed Profiles for Large Upcoming Projects Power , 750 MW Bongaigaon, 1000 MW Mauda, 1000 MW Vindhyachal , 1000 MW Rihand-III , 390 MW Muzzaffarpur , 1980 MW Barh STPP-1 ,2980 MW Sipat-I ,1000 MW Vallur Thermal ,500 MW Vallur Thermal ,480 MW Margherita ,500 MW Garo Hills ,1980 MW Nabinagar ,500 MW Satpura ,1200 MW Shree Singaji ,1000 MW Anpara-D ,1000 MW Chandrapura ,1980 MW Koradi ,1000 MW Marwa ,1200 MW Kallisindh ,500 MW Chhabra ,1600 MW Krishnapattam ,2640 MW Bhavanpandu 1320 MW Simhapuri, 1320 MW Mundra ,1720 MW Sintex ,1320 MW Shapoornji ,1320 MW Arjun,2400 MW Essar,1000 MW Pipavav, 1320 MW Visa Pipavav,1200 MW SKS Raigarh, 1200 MW Aryan Coal ,1980 MW Welspun, Madhya Pradesh Thermal Power Plant, 2520 MW Anuppur ,1320 MW Era,1320 MW SEW ,1200 MW Jhabua, 5280 MW Rewa, 1320 MW Khandwa,1320 MW SJK Powergen ,1050 MW Finolex, 2640 MW Bhandara ,1320 MW Lenexis, 1320 MW Astrac, 1320 MW KU, 1320 MW Babandh ,2400 MW Sterlite, 1000 MW Thammenapatnam ,1320 MW Hardoi ,1500 MW Tiana, 3200 MW JSW Energy ,1400 MW Auraiya ,1050 MW Anta, Combined Cycle Power Plant,1050 MW Badarpur, 1000 MW Tuticorin, JV 1500 MW Aravali, Super 3300 MW ,Dondaicha 1300 MW, DMICDC 1600 MW, Kasargode 1600 MW, Bardhaman 1600 MW ,Ennore SEZ 800 MW ,Wanakbori 600 MW ,Korba West 1320 MW ,HDIL- 1350 MW ,India Bulls- 600 MW, Dhariwal 1500 MW, Tiana 300 MW Emco Waora ,2640 MW BTPCL ,1800 MW Derang ,700 MW Ind Barath ,2640 MW Talwandi Sabo ,1320 MW Mirzarpur ,1400 MW Nabha ,1440 MW Uchpanda ,1050 MW Kamalanga, 660 MW Tiroda ,1600 MW Tata ,3960 MW Sasan ,UMPP1050 MW Sambalpur, 520 MW Goindwal Sahib, 1200 MW DB ,1320 MW Nigrie ,1200 MW Mahan ,700 MW Karimnagar, 2100 MW Tadadi ,726 MW Tripura, 1220 MW Uran ,800 MW GVK Group MerchantPower Plant,470 MW PESPL, 1350 MW Spectrum, 742 MW Lanco Power Plant,366 MW Lanco Kondapalli ,108 MW NDPL 2015, MW Hazira 2100 MW, Ratnagiri ,7480 MW Dadri ,300 MW Kalawati Ispat ,700 MW Dharmapuri ,800 MW Reliance 1000 MW, Latur HydroKameng ,Kameng-I (Bhareli-I) ,HEP Khangten, Small Mawphu, Hydro Electric RangaNadi ,HEP-Stage-II Koldam ,Hydroelectric ,Kameng-I (Bhareli-I) ,HEP Shahpura, TPP Bursar HEP, Chamera HEP Stage III,Chungar Chal Project,Dibang Multipurpose, Garba Tawaghat, Goriganga-IIIA,Karmoli Lumti Tulli,Kiru HEP,Kishanganga HEP,Kotli Bhel Stage IA,Kotli Bhel Stage IB,Kotli Bhel Stage II,Kwar ,Nimoo Bazgo HEP,Pakal Dul HEP,Parbati HEP Stage III,Parbati Hydro ,Subansiri Middle,Subansiri (Upper),Tawang I Hydro Project,Tawang II Hydro Project,Teesta Low Dam Stage IV,URI Hydro Power Project,Vyasi Project,Attunli,Etalin,Koldam,Kolodyne Stage II, Lata Tapovan ,Rammam, Rupsiabagar, Khasiyabara, Singrauli, Tapovan - Vishnugad,Arun III,Devsari,Dhaulasidh,Jakhol Sankari HEP,Jakhol Sankri,Khab,Naitwar Mori,Sankosh Multipurpose,Jelam Tamak Hydro Electric,Kishau Dam,Tehri Pump Storage,Vishnugad Pipalkoti,Dibbin HEP,Nafra HEP,Anjaw HEP,Demwe Lower HEP,Demwe Upper HEP,Dinchang HEP,Emini 500 MW HEP, Mihundon, Talong, Tipang, Gundia,KYNSHI II,Sindol - I HEP,Panan HEP,Tashiding,Teesta,Teesta Stage VI,Alaknanda HEP,Alaknanda,Arakot Tiuni 81 MW HEP, Duncans, Alakananda, Srinagar, Kanthanapally Sujala Sravanthi Project, Nagarjunasagar Tail ,Priyadarshini Jurala HEP,Pulichintala HEP,Sriramsagar Hydro ,Power Station Stage-II,UHL Power Company,Shivanasamudram,Gundia HEP Phase-I,Gundia HEP Phase-II,Mukerian Hydel Project Stage-II,Shahpur Kandi HEP, Bhawani Kattalai,Barrage-II,Pala Maneri ,Hydroelectric Plant,Tuivai,Dhukwan,Gohan,Singoli Bhatwari,Seli,Dhamwari Sunda,Allain Duhnagan,Renewable,future solar plants,Wind,Waste to Energy,Captive Power Plants,Nuclear Plants,Kakarpar Nuclear Power,Station (KAPS) - III,Kakarpar Nuclear Power,Station (KAPS) - IV,Oil and Gas,NELP Blocks,RefineriesKakinada Oil RefineryVisakhapatanam Refinery Ongcankleshwar Ratnagiri IOCL Paradip Bhatinda Raniganj North Raniganj South RG(EAST)-CBM-,Coal Washeries,HIngula,IB Valley, Basundhara, Jagannath, Nanadan Washery, Ashoka,Dhori, Karo, Konar, Madhuband, Patherdih, Dugda, Dahibari, Bhojudih NC,Sinepur Bazari,Chitra,Kusmunda,Earound,Telecom,Telecom Tower,Railways, Proposed Locomotives,LNG Terminals Mundra Kochi Dabhol terminal Ennore Haldia ,Pipelines Gas Pipeline Chennai Pipeline Kakinada -Haldia Vijayawada-Vijapur Kakinada- ,Ahemedabad Mallavaram-Bhilwara Jagdishpur-Haldia,Dahej-Vijaipur Mehsana-Bhatinda Surat-Paradip Chainsa-GurgaonHissar Kochi-Banglore/ ,Mangalore Kochi-Kayamkulam Dabhol-Bangalore Dahivali-Pune Bhatinda-Srinagar KaranpuraMoradabadKashipur-Rudrapur Ramgarh Terminal Chennai-Tuticorin Dadri-BawanaNangal Durgapur-Kolkata Crude Pipeline Mundra-Bhatinda Manglore-Padur Product Pipeline Viramgam-Kandla Bahadurgarh-Tikri Kalan Bina-Kota Paradip-New Sambalpur-RaipurRanchi Paradip-Allahabad Raman MandiBhatinda Mathura-Jalandhar LPG Pipeline Okha-Jamnagar Uran-Chakan Paradip-Durgapur,CBM Blocks GV(NORTH)-CBM-2005/III KG(E)-CBM-2005/III AS-CBM-2008/IV SN(NORTH)-CBM-2003/II TR-CBM-2005/III MR-CBM-2005/III BS(3)-CBM-2003/II BK-CBM-2001/1 JHARIA,Rail Containers Terminals,Roads and Highways,Upcoming Roads ,Highways in India,Upcoming Toll Plazas,Airports,Jharsuguda Airport,Rourkela Airport,Shirdi Airport,Bagdogra Airport,Barrackpore Air Force Station,Gandhinagar Airport,Hirakud Airport,Kannur International Airport,Lal Bahadur Shastri InternationalAirport ,Neyveli Airport,Pondicherry Airport,Ratnagiri Airport,Taj International Airport,Thanjavur Air Force Station,Uttarlai Airport,Yelahanka Airforce station,Cargo Warehouses,Ports,,Kolkata,Haldia,Paradip,Vishakapatnam,Ennore,Chennai,Tuticorn,Cochin,New,Mangalore,Mormugao,Mumbai,JNPT,Kadla,Magdalla,Porbandar,Okha,BediNavalakhi,Bhavnagar,Mandvi,Kudankulam,Nagapattinam,Kanyakumari,Neendakara,Kozhikode/Beypor,Kovalam-Vizhinjam,Kakinada Anchorage ,Kakinada Deep Water ,Krishnapatnam, Gopalpur, Mayabunder, Car Nicobar, Hut Bay, Nancowry, Compbell, Rangat, Shipyards ,Cochin Shipyard Ltd. ,Garden Reach ,Shipbuilders & ,Engineers Ltd. ,Goa Shipyard Ltd. ,Hindustan Shipyard Ltd. ,Hooghly Dock & Port ,Enginers Ltd.Mazagon Dock Ltd.,Shalimar Works Ltd,ABG Shipyard Ltd. ,Bharati Shipyard Ltd. ,Chowgule & Co. Ltd.,Sesa Goa Ltd.,A.C Roy & Comp. Ltd.,Bristol Boats ,Wadia Boat Builders ,Tebma Shipyards Ltd.,Larsen & Toubro Limited ,N N Shipbuilders and ,Engineers Pvt Ltd ,Pipavav,Alang Marine Shipyard,Corporated Consultancy,Shipyard East Coastboat Builders ,Waterway ,Lakhirpur- Bhanga,Kaladan Project,Goa Waterways,Maharasthra Waterways,Cargo Movement ,Fertilizers,Logistics,Air Cargo Operators ,Road Transport Players,Logistics Service ,Provider,Equipment Logistics,Warehouses,
Share:

Realizing the need of infrastructure development to foster rapid economic growth, the government of India has been making efforts to augment the infrastructure development across all spheres in the country. Investment outlay on infrastructure development has been more than doubled from US$ 218 billion in the X Plan to US$ 515 billion in the XI Plan. As a result of this increased investment allocations to infrastructure sector especially to private sector, infrastructure sector as a whole has received project approvals worth Rs 4,58,209 crore in the last five years (2007-11). Annual infrastructure project approvals in the country increased from Rs 55,424 crore in 2007 to Rs 1,36,327 crore by 2010. However, 2011 witnessed a decline in the infrastructure project approvals to Rs 93,025 crore mainly because of the general economic slowdown. Infrastructure sector is expected to offer immense opportunities in the near future as well, with US$ 1 Trillion investment being envisaged for the Infrastructure development in the proposed 12th Plan (2012-17).

However, details of upcoming infrastructure projects are crucial for leveraging these investment opportunities for all stakeholders across the infrastructure sector. Nevertheless, such data is not available in the country in a comprehensive manner.

Thus in order to bridge this gap, SNP infra Research Solutions has prepared a comprehensive database of all the Upcoming Infrastructure Projects in India encompassing all infrastructure sectors such as power (including Solar, wind, small hydro, waste to energy),captive power plants, oil & gas (nelp blocks, cbm blocks, refineries, LNG terminals, coal, telecom, railways, airports, ports & shipping, inland waterways, logistics, roads and highways which are either under construction, approved or announced. This includes more than 45,000 projects, whose details are provided by SNP Infra in user-friendly excel format which enables quick tabulations and analysis. Following project details will be provided under this:

  • Name of the project
  • Sector
  • State
  • Year of commissioning
  • Expected investment
  • Mode of investment
  • Developer name
  • Owner name
  • Capacity (MW)
  • Fuel type
  • Environmental clearance
  • Land acquisition
  • Project cost
  • Linkages etc.

In addition, with this database, SNP Infra is also providing an overall analysis of these projects and detailed project profiles of around 375+ large infrastructure projects. The detailed profiles will include status updates of each project in a chronological order i.e the quarter/month wise updates from the initiation of the project to till date. These will also include location map, PPA’s, nearest linkages (Railway, Airports, Warehouse, Road, Water), ordering status, financial closure, and equipment supplier details, commodities imported, commodities exported).Further a special section has been added to each profile under the heading key contacts (comprising of name, designation, contact no and Email id ) which will help the buyer of this database to target potential clients.

This report is a must buy for:

Power Companies, Oil & Gas Companies, Airport Developers / Operators, Port Developers / Operators, Road & Highways Developers, Toll Plaza/ Booth Operators, Rail Operators, Road developers/Operators, Policy Makers, Financial Institutions and Banks, Private Equity (PE) Investors, Construction Companies / EPC, Contractors, Construction Equipment - Manufacturers / Suppliers, Consultancy Organizations, Engineering Firms, IT Solutions Providers, Logistics / Supply Chain, Companies, Transport Operators, Academic & Research Bodies, Allied Industries (Cement, Iron, Steel Producers, etc), Private Equity firms, Insurance firms, Sector Specialists, Finance Managers in Infrastructure Sector

Report Classification Research Report
Tags Upcoming Infrastructure Projects in India- An Analysis Investment Outlays, Private Sector Investment, Sector wise Share, State-wise Share, Investment Type Share, Stages of Development Share , Owner wise share, Detailed Profiles for Large Upcoming Projects Power , 750 MW Bongaigaon, 1000 MW Mauda, 1000 MW Vindhyachal , 1000 MW Rihand-III , 390 MW Muzzaffarpur , 1980 MW Barh STPP-1 ,2980 MW Sipat-I ,1000 MW Vallur Thermal ,500 MW Vallur Thermal ,480 MW Margherita ,500 MW Garo Hills ,1980 MW Nabinagar ,500 MW Satpura ,1200 MW Shree Singaji ,1000 MW Anpara-D ,1000 MW Chandrapura ,1980 MW Koradi ,1000 MW Marwa ,1200 MW Kallisindh ,500 MW Chhabra ,1600 MW Krishnapattam ,2640 MW Bhavanpandu 1320 MW Simhapuri, 1320 MW Mundra ,1720 MW Sintex ,1320 MW Shapoornji ,1320 MW Arjun,2400 MW Essar,1000 MW Pipavav, 1320 MW Visa Pipavav,1200 MW SKS Raigarh, 1200 MW Aryan Coal ,1980 MW Welspun, Madhya Pradesh Thermal Power Plant, 2520 MW Anuppur ,1320 MW Era,1320 MW SEW ,1200 MW Jhabua, 5280 MW Rewa, 1320 MW Khandwa,1320 MW SJK Powergen ,1050 MW Finolex, 2640 MW Bhandara ,1320 MW Lenexis, 1320 MW Astrac, 1320 MW KU, 1320 MW Babandh ,2400 MW Sterlite, 1000 MW Thammenapatnam ,1320 MW Hardoi ,1500 MW Tiana, 3200 MW JSW Energy ,1400 MW Auraiya ,1050 MW Anta, Combined Cycle Power Plant,1050 MW Badarpur, 1000 MW Tuticorin, JV 1500 MW Aravali, Super 3300 MW ,Dondaicha 1300 MW, DMICDC 1600 MW, Kasargode 1600 MW, Bardhaman 1600 MW ,Ennore SEZ 800 MW ,Wanakbori 600 MW ,Korba West 1320 MW ,HDIL- 1350 MW ,India Bulls- 600 MW, Dhariwal 1500 MW, Tiana 300 MW Emco Waora ,2640 MW BTPCL ,1800 MW Derang ,700 MW Ind Barath ,2640 MW Talwandi Sabo ,1320 MW Mirzarpur ,1400 MW Nabha ,1440 MW Uchpanda ,1050 MW Kamalanga, 660 MW Tiroda ,1600 MW Tata ,3960 MW Sasan ,UMPP1050 MW Sambalpur, 520 MW Goindwal Sahib, 1200 MW DB ,1320 MW Nigrie ,1200 MW Mahan ,700 MW Karimnagar, 2100 MW Tadadi ,726 MW Tripura, 1220 MW Uran ,800 MW GVK Group MerchantPower Plant,470 MW PESPL, 1350 MW Spectrum, 742 MW Lanco Power Plant,366 MW Lanco Kondapalli ,108 MW NDPL 2015, MW Hazira 2100 MW, Ratnagiri ,7480 MW Dadri ,300 MW Kalawati Ispat ,700 MW Dharmapuri ,800 MW Reliance 1000 MW, Latur HydroKameng ,Kameng-I (Bhareli-I) ,HEP Khangten, Small Mawphu, Hydro Electric RangaNadi ,HEP-Stage-II Koldam ,Hydroelectric ,Kameng-I (Bhareli-I) ,HEP Shahpura, TPP Bursar HEP, Chamera HEP Stage III,Chungar Chal Project,Dibang Multipurpose, Garba Tawaghat, Goriganga-IIIA,Karmoli Lumti Tulli,Kiru HEP,Kishanganga HEP,Kotli Bhel Stage IA,Kotli Bhel Stage IB,Kotli Bhel Stage II,Kwar ,Nimoo Bazgo HEP,Pakal Dul HEP,Parbati HEP Stage III,Parbati Hydro ,Subansiri Middle,Subansiri (Upper),Tawang I Hydro Project,Tawang II Hydro Project,Teesta Low Dam Stage IV,URI Hydro Power Project,Vyasi Project,Attunli,Etalin,Koldam,Kolodyne Stage II, Lata Tapovan ,Rammam, Rupsiabagar, Khasiyabara, Singrauli, Tapovan - Vishnugad,Arun III,Devsari,Dhaulasidh,Jakhol Sankari HEP,Jakhol Sankri,Khab,Naitwar Mori,Sankosh Multipurpose,Jelam Tamak Hydro Electric,Kishau Dam,Tehri Pump Storage,Vishnugad Pipalkoti,Dibbin HEP,Nafra HEP,Anjaw HEP,Demwe Lower HEP,Demwe Upper HEP,Dinchang HEP,Emini 500 MW HEP, Mihundon, Talong, Tipang, Gundia,KYNSHI II,Sindol - I HEP,Panan HEP,Tashiding,Teesta,Teesta Stage VI,Alaknanda HEP,Alaknanda,Arakot Tiuni 81 MW HEP, Duncans, Alakananda, Srinagar, Kanthanapally Sujala Sravanthi Project, Nagarjunasagar Tail ,Priyadarshini Jurala HEP,Pulichintala HEP,Sriramsagar Hydro ,Power Station Stage-II,UHL Power Company,Shivanasamudram,Gundia HEP Phase-I,Gundia HEP Phase-II,Mukerian Hydel Project Stage-II,Shahpur Kandi HEP, Bhawani Kattalai,Barrage-II,Pala Maneri ,Hydroelectric Plant,Tuivai,Dhukwan,Gohan,Singoli Bhatwari,Seli,Dhamwari Sunda,Allain Duhnagan,Renewable,future solar plants,Wind,Waste to Energy,Captive Power Plants,Nuclear Plants,Kakarpar Nuclear Power,Station (KAPS) - III,Kakarpar Nuclear Power,Station (KAPS) - IV,Oil and Gas,NELP Blocks,RefineriesKakinada Oil RefineryVisakhapatanam Refinery Ongcankleshwar Ratnagiri IOCL Paradip Bhatinda Raniganj North Raniganj South RG(EAST)-CBM-,Coal Washeries,HIngula,IB Valley, Basundhara, Jagannath, Nanadan Washery, Ashoka,Dhori, Karo, Konar, Madhuband, Patherdih, Dugda, Dahibari, Bhojudih NC,Sinepur Bazari,Chitra,Kusmunda,Earound,Telecom,Telecom Tower,Railways, Proposed Locomotives,LNG Terminals Mundra Kochi Dabhol terminal Ennore Haldia ,Pipelines Gas Pipeline Chennai Pipeline Kakinada -Haldia Vijayawada-Vijapur Kakinada- ,Ahemedabad Mallavaram-Bhilwara Jagdishpur-Haldia,Dahej-Vijaipur Mehsana-Bhatinda Surat-Paradip Chainsa-GurgaonHissar Kochi-Banglore/ ,Mangalore Kochi-Kayamkulam Dabhol-Bangalore Dahivali-Pune Bhatinda-Srinagar KaranpuraMoradabadKashipur-Rudrapur Ramgarh Terminal Chennai-Tuticorin Dadri-BawanaNangal Durgapur-Kolkata Crude Pipeline Mundra-Bhatinda Manglore-Padur Product Pipeline Viramgam-Kandla Bahadurgarh-Tikri Kalan Bina-Kota Paradip-New Sambalpur-RaipurRanchi Paradip-Allahabad Raman MandiBhatinda Mathura-Jalandhar LPG Pipeline Okha-Jamnagar Uran-Chakan Paradip-Durgapur,CBM Blocks GV(NORTH)-CBM-2005/III KG(E)-CBM-2005/III AS-CBM-2008/IV SN(NORTH)-CBM-2003/II TR-CBM-2005/III MR-CBM-2005/III BS(3)-CBM-2003/II BK-CBM-2001/1 JHARIA,Rail Containers Terminals,Roads and Highways,Upcoming Roads ,Highways in India,Upcoming Toll Plazas,Airports,Jharsuguda Airport,Rourkela Airport,Shirdi Airport,Bagdogra Airport,Barrackpore Air Force Station,Gandhinagar Airport,Hirakud Airport,Kannur International Airport,Lal Bahadur Shastri InternationalAirport ,Neyveli Airport,Pondicherry Airport,Ratnagiri Airport,Taj International Airport,Thanjavur Air Force Station,Uttarlai Airport,Yelahanka Airforce station,Cargo Warehouses,Ports,,Kolkata,Haldia,Paradip,Vishakapatnam,Ennore,Chennai,Tuticorn,Cochin,New,Mangalore,Mormugao,Mumbai,JNPT,Kadla,Magdalla,Porbandar,Okha,BediNavalakhi,Bhavnagar,Mandvi,Kudankulam,Nagapattinam,Kanyakumari,Neendakara,Kozhikode/Beypor,Kovalam-Vizhinjam,Kakinada Anchorage ,Kakinada Deep Water ,Krishnapatnam, Gopalpur, Mayabunder, Car Nicobar, Hut Bay, Nancowry, Compbell, Rangat, Shipyards ,Cochin Shipyard Ltd. ,Garden Reach ,Shipbuilders & ,Engineers Ltd. ,Goa Shipyard Ltd. ,Hindustan Shipyard Ltd. ,Hooghly Dock & Port ,Enginers Ltd.Mazagon Dock Ltd.,Shalimar Works Ltd,ABG Shipyard Ltd. ,Bharati Shipyard Ltd. ,Chowgule & Co. Ltd.,Sesa Goa Ltd.,A.C Roy & Comp. Ltd.,Bristol Boats ,Wadia Boat Builders ,Tebma Shipyards Ltd.,Larsen & Toubro Limited ,N N Shipbuilders and ,Engineers Pvt Ltd ,Pipavav,Alang Marine Shipyard,Corporated Consultancy,Shipyard East Coastboat Builders ,Waterway ,Lakhirpur- Bhanga,Kaladan Project,Goa Waterways,Maharasthra Waterways,Cargo Movement ,Fertilizers,Logistics,Air Cargo Operators ,Road Transport Players,Logistics Service ,Provider,Equipment Logistics,Warehouses
No. of Pages 4000
Format PDF
Date of Publication 2012-10-15